Case Study: 60% Reduction in Lead Time for Rail Vehicle Assembly Projects

Discover how TARGUS boosted transparency in rail vehicle assembly and cut production lead time by 60% without adding extra manufacturing capacity.

Challenge

In complex on-site manufacturing, project delays rarely stem from a lack of effort, they’re due to a lack of transparency. Unlike automated production lines, construction sites don’t have sensor networks for real-time progress tracking. Updates live in team members’ minds, departments report varying realities, and problems often surface only after escalation.

Approach

TARGUS enabled informed, data-driven project management through a three-step digitalization process:

  • Progress Tracking: By digitalizing the assembly workflow and capturing real-time status, TARGUS created the first reliable and actionable overview of every project’s actual position.
  • Assembly Leveling: The proprietary TARGUS TaktTool synchronized uneven assembly operations into balanced, standardized workflows. This enabled consistent material provision, predictable staffing, and repeatable routines.
  • Steering with Live Data: All progress and takt data flow directly into Power BI on the shop floor. Waiting times and idle periods are instantly visible and resolved through rapid improvement cycles, including direct interfaces between engineering and production.

Results

Within just five months, TARGUS delivered measurable impact on a major assembly project:

0 %

shorter lead times

0 %

higher productivity

0 %

fewer production hours

Key Takeaways for Manufacturers

  • Transparency is fundamental to effective project management. What’s invisible cannot be optimized.
  • Standardized workflows turn bottlenecks and downtime into predictable, manageable factors—creating stability.
  • Lasting improvement comes from rigorous implementation and cross-functional teamwork.

Facing challenges with complex manufacturing projects? Schedule a free consultation with TARGUS and unlock new levels of transparency and efficiency.

TARGUS Aktuell

Wir unterstützen weltweit namhafte Unternehmen aus Industrie und Handel bei allen Fragen zur Optimierung der gesamten operativen Wertschöpfungskette

Suche

Letzte News

TARGUS and maexpartners

Powerful Alliance for Lasting Success in Manufacturing Industries: Discover how TARGUS and maexpartners can help you boost your competitiveness – learn more about this combined consulting expertise.

Mehr erfahren »

TARGUS Invests in MAindTec: Transforming Product Cost Management with World-Class AI

Case Study: 60% Reduction in Lead Time for Rail Vehicle Assembly Projects

TARGUS Management Consulting Appoints Dr. Sascha Schuth as SVP Strategy, Mergers & Acquisitions

Product Portfolio Optimization: The Key to Sustainable Business Success

TARGUS and maexpartners

Realization of potentials and sustainable anchoring of product cost management in the organization