Discover how TARGUS boosted transparency in rail vehicle assembly and cut production lead time by 60% without adding extra manufacturing capacity.
Challenge
In complex on-site manufacturing, project delays rarely stem from a lack of effort, they’re due to a lack of transparency. Unlike automated production lines, construction sites don’t have sensor networks for real-time progress tracking. Updates live in team members’ minds, departments report varying realities, and problems often surface only after escalation.
Approach
TARGUS enabled informed, data-driven project management through a three-step digitalization process:
- Progress Tracking: By digitalizing the assembly workflow and capturing real-time status, TARGUS created the first reliable and actionable overview of every project’s actual position.
- Assembly Leveling: The proprietary TARGUS TaktTool synchronized uneven assembly operations into balanced, standardized workflows. This enabled consistent material provision, predictable staffing, and repeatable routines.
- Steering with Live Data: All progress and takt data flow directly into Power BI on the shop floor. Waiting times and idle periods are instantly visible and resolved through rapid improvement cycles, including direct interfaces between engineering and production.
Results
Within just five months, TARGUS delivered measurable impact on a major assembly project:
shorter lead times
higher productivity
fewer production hours
Key Takeaways for Manufacturers
- Transparency is fundamental to effective project management. What’s invisible cannot be optimized.
- Standardized workflows turn bottlenecks and downtime into predictable, manageable factors—creating stability.
- Lasting improvement comes from rigorous implementation and cross-functional teamwork.
Facing challenges with complex manufacturing projects? Schedule a free consultation with TARGUS and unlock new levels of transparency and efficiency.